My Reno Guys (Market Leverage Limited)
TERMS AND CONDITIONS OF TRADE
1. Definitions
• “Company” means “My Reno Guys” its successors and assigns.
• “Client” means the person, firm, or corporate entity buying the Services or Goods as specified in any invoice, quote, or work authorisation.
• “Works” means all renovation, construction, project management, and design services provided by the Company.
• “Goods” means all building materials, fixtures, and products supplied to the site.
2. Quotations and Acceptance
• Validity: Quotes are valid for thirty (30) days from the date of issue.
• Acceptance: The Client accepts these terms by signing the quote, providing written instruction via email, or permitting the Works to commence on-site.
• Exclusions: Unless explicitly stated, quotes exclude council consent fees, engineering fees, and hazardous material remediation (e.g., asbestos), and costs associated with “unforeseen conditions” as defined in clause 4.
3. Price and Payment
• Contract Price: The Price shall be the amount stated in the approved quote plus any authorised variations.
• Progress Payments: The Company will submit progress payment claims at monthly intervals, or upon reaching specific project milestones.
• Payment Due Date: All invoices must be paid within seven (7) days of the invoice date, strictly overriding any standard 20th-of-the-month commercial terms.
• Construction Contracts Act 2002: Progress claims are made explicitly under the Construction Contracts Act 2002. Any Payment Schedule disputing a claim must be served by the Client within five (5) working days of the invoice issue date.
4. No Set-Off
The Client shall pay all amounts due under these Terms and Conditions in full without any deduction, withholding, set-off, or counterclaim whatsoever. The Client is not entitled to withhold payment or deduct any amount claimed by the Client against My Reno Guys for any alleged breach of contract, defect, or dispute arising under these Terms or any other agreement between the parties.
5. Variations and Price Escalations
• Written Variations: Any deviation or addition to the original scope of work will be treated as a variation. The Company will provide a cost estimate, and variations must be approved in writing before work proceeds.
• Variations in General: Variations can affect project planning, administration, documentation and scheduling. Whilst variations may be necessary these add a lot of unseen background work and planning to ensure accuracy is maintained. Therefore, The Company reserves the right to charge a $500 +GST variation fee per variation request.
• Unforeseen Conditions: If the Company encounters hidden structural defects, moisture damage, or underground obstacles, the extra costs to rectify these will be charged as a mandatory variation.
• Material Cost Increases: The Company reserves the right to adjust the final contract price to reflect market-driven cost increases for building materials or transport costs that occur between quote acceptance and installation.
6. Site Access and Time for Completion
• Clear Access: The Client must provide the Company with uninterrupted, safe access to the site during standard working hours (7:30 AM – 5:30 PM, Monday to Saturday).
• Site Utilities: The Client will provide adequate electricity, water supply and ablution facilities at no cost to the Company.
• Delays: Timelines provided are estimates only. The Company is not liable for project delays caused by severe weather, delayed council inspections, material supply chain shortages, client-driven delays, or delays outside the reasonable control of the Company.
7. Risk, Retentions and Retention of Title (PPSA)
• Risk: Risk of damage or loss to Goods passes to the Client immediately upon delivery to the project site. The Client must ensure the site is secure and is responsible for the insurance of all materials and fixtures once delivered to site.
• Ownership: Ownership and legal title of all Goods and materials remain strictly with the Company until the Client pays all outstanding invoices in full.
• PPSR: The Client acknowledges that these terms create a purchase money security interest under the Personal Property Securities Act 1999 (PPSA) over all supplied Goods. Or in layman’s terms, if the company supplies materials or goods, it keeps a legal security right over them until the client has paid for them.
• Payment and Defective Work: The Client shall pay all invoices in full without deduction, set-off, or retention unless previously agreed in writing. For residential building work, the Client is protected by the implied warranties under the Building Act 2004 and the Consumer Guarantees Act 1993. Any defects or remedial work notified to the Company will be remedied in accordance with our statutory obligations within a reasonable timeframe, but shall not entitle the Client to withhold payment of undisputed amounts on an outstanding invoice.
8. Defects and Warranties
• Defect Period: The Client must inspect the Works upon practical completion and notify the Company in writing of any defects or omissions within seven (7) days.
• Rectification: The Company will be given the first opportunity to remedy any legitimate defect reported within this period.
• Manufacturer Warranties: For fixtures, appliances, and materials supplied by third parties, the Company passes on the manufacturer’s warranty to the Client but provides no additional warranty.
• Warranty: The warrantee of the Company is limited to workmanship.
• Consumer Guarantee Act: You are protected by the Consumer Guarantees Act 1993 for all personal or domestic services supplied.
9. Payment Default / Disputes
• Late Interest: Interest on overdue invoices will accrue daily at a rate of 2.5% per month from the due date until paid.
• Suspension of Works: If an invoice remains unpaid past its due date, the Company reserves the right to halt all Works on site immediately without liability for any resulting delays.
• Recovery Costs: The Client agrees to indemnify the Company for all debt collection agency fees and actual legal costs (on a solicitor-client basis) incurred in recovering overdue funds.
• Expectations: In the case of a discrepancy in project expectations, the agreed quote and construction plans will serve as the final determinative evidence.”
10. Maintenance, Repairs and Restoration
• Client Maintenance: Following practical completion, the Client is responsible for routine cleaning, servicing, sealing, painting, ventilation, drainage clearing, and all ongoing maintenance of the Works in accordance with good industry practice and any care instructions, product manuals, or manufacturer requirements supplied.
• Fair Wear and Tear / Exclusions: The Company is not liable for deterioration, shrinkage, movement, cracking, corrosion, discolouration, blocked drainage, mould, or other damage arising from fair wear and tear, weather events, lack of maintenance, misuse, third-party interference, or work not carried out by the Company.
• Repairs to Damage: Where the Company returns to site to repair damage caused by the Client, occupants, pets, other contractors, or events outside the Company’s control, that work will be treated as a variation and charged at the Company’s prevailing rates plus materials.
• Restoration and Matching: Any repair, replacement, or remedial work will be limited to restoring the affected area as nearly as reasonably practicable. The Company does not guarantee an exact match of existing colours, finishes, textures, batches, aged materials, or previously weathered surfaces where equivalent materials are unavailable or natural variation occurs.
• Professional Standard / No “As New” Representation: Maintenance Services, Repair Services, and Restoration Services will be carried out with reasonable care and skill to a professional trade standard appropriate to the age, condition, and nature of the affected area. Unless expressly agreed in writing, the Company does not represent or warrant that such services will return any item, surface, finish, or area to an “as new”, “like new”, or brand-new appearance.
• Access for Remedial Work: The Client must provide reasonable access, power, water, and a safe working environment for any inspection, repair, or remedial work. If access is delayed or restricted, the Company’s obligations are suspended until access is available.
• Statutory Rights Preserved: Nothing in this clause limits any rights or remedies that cannot lawfully be excluded under the Building Act 2004, Consumer Guarantees Act 1993, or any other applicable New Zealand law.
11. Limitation of Liability
• Direct Losses Only: The Company’s maximum liability for any defect, delay, or breach of contract is strictly capped at the total Price paid by the Client for the Works.
• No Consequential Loss: The Company will not be liable to the Client for any indirect economic loss, loss of business revenue, or operational downtime suffered during the renovation process.
• Consumer Guarantees Act: The Client acknowledges that the Works are acquired for business purposes, and therefore the provisions of the Consumer Guarantees Act 1993 do not apply.
12. Dispute Resolution
• Good Faith: In the event of a dispute, both parties agree to meet in good faith to resolve the issue through direct negotiation.
• Adjudication: If negotiation fails, either party may refer the matter to fast-track adjudication under the Construction Contracts Act 2002.
• Disputes: Regardless of the ownership of the Client company, any dispute is to be settled within Auckland, New Zealand and according to New Zealand law.
13. Cancellations and rescheduling
• Cancelling a Job Order: Please notify us of your intention to cancel as soon as possible. If you have paid a deposit you must notify us of your intention to cancel within 72 hours of the start time of the Job Order for a full refund of the deposit, minus any materials purchased or ordered for the work.
o If less than 72 hours’ notice is given we are only obliged to refund 20% of the deposit, minus any materials purchased or ordered for the work.
o If less than 12 hours’ notice is given there can be no refund of deposits.
o There is no charge to reschedule work.
• Rescheduling: There is no charge to reschedule work, however if costs change a new quote may need to be issued.
14. Force Majeure
Definition: Neither the Company nor the Client shall be liable for any failure or delay in performing their obligations under this contract if such failure or delay is caused by events beyond their reasonable control.
Included Events: Force Majeure events include, but are not limited to:
• Acts of God, extreme weather events, storms, floods, earthquakes, or landslips.
• Pandemics, epidemics, government-mandated lockdowns, or restrictions.
• Strikes, lockouts, labor disputes, or industrial action.
• Acts of war, terrorism, civil unrest, or governmental restrictions.
• Critical global or national supply chain disruptions, material shortages, or freight/shipping embargoes preventing the acquisition of necessary Goods.
Notice and Mitigation: The party affected by a Force Majeure event must notify the other party in writing as soon as reasonably practicable, detailing the nature of the event and the expected impact on the Works. Both parties will use all reasonable endeavors to mitigate the effects of the delay.
Extension of Time and Costs: If a Force Majeure event occurs, the time for the Company to complete the Works shall be extended by a period equivalent to the time lost. The Company reserves the right to claim from the Client any direct, reasonable additional costs incurred as a direct result of suspending and subsequently resuming the Works (such as secure site storage or protection of materials).
Termination: If a Force Majeure event continues uninterrupted for a period exceeding thirty (30) days, either party may terminate the contract by giving written notice to the other. Upon termination, the Client shall pay the Company for all Works completed and Goods supplied up to the date of termination, along with any unrecoverable commitments or materials already ordered.
15. Privacy Act and Confidentiality
• Authority to act: You authorise us to use information collected from you and to collect information from third parties for the purpose of providing optimised performance.
• Confidentiality: Incidental to this agreement we may each be exposed to confidential information belonging to the other. We both agree that we will keep such information confidential and shall only use that information for the purposes of complying with our respective obligations under this agreement.
• Photo Release: By accepting this quote, you grant us permission to use project photos for efficient management of the project and/or for marketing purposes. Any personal information or sensitive items will be excluded or blurred.
16. General
• Sub-contracting: We may sub-contract any part of the supply of Services to our approved network of trades to gain maximum efficiency in managing timeframes.
• Council consents: According to New Zealand law the client is responsible for all council and local authority consents. You may ask for notice of practical completion and in some cases a PS3. If you require help with consents please ask. This will incur additional costs.
• Insurance: We recommend letting your home insurer know about your upcoming project so you remain fully covered during the work.
• Asbestos: Quotes do not cover asbestos testing or removal. If any is found, we’ll discuss the additional costs with you before proceeding.
• Site Safety during customer visits: During work hours customers may visit a site guided by the Project Manager. We keep the workspace as neat and safe as possible at the end of every day. However, active work zones can still pose hazards, so please check in with your Project Manager before entering the site.
17. Health and Safety
• HSWA Compliance: Both parties must strictly comply with their obligations under the Health and Safety at Work Act 2015 (HSWA) and all associated regulations.
• Site Control (PCBU): The Company acts as the Person Conducting a Business or Undertaking (PCBU) with primary management and control of the immediate workspace. The Client remains the PCBU for the broader premises. Both parties agree to consult, cooperate, and coordinate activities to manage risks.
• Inductions and Hazards: The Client must disclose all known site-specific hazards (e.g., structural weaknesses, asbestos, or hazardous machinery) before work starts. All Client staff, tenants, or visitors entering the designated work zone must complete the Company’s site safety induction and wear mandatory Personal Protective Equipment (PPE).
• Contractors, Sub-contractors: Must observe and comply with the site health and safety policy and are responsible for their own health and safety plan and relevant insurances.
• Right to Halting Work: The Company reserves the right to suspend all Works immediately if it identifies an unmitigated safety risk, an uncooperative site user, or an undisclosed hazard. The Company will not be liable for any project delays or costs resulting from a safety-related shutdown.
• Asbestos and Hazardous Materials: If the Company suspects the presence of asbestos or other hazardous materials not identified in the quote, work in that area will cease instantly. The Client will bear all costs for testing, specialized air monitoring, and licensed removal before work can resume.
18. Disclaimer: These conditions are subject to reasonable change at the discretion of the Company.
